Tianjin Lida Changji Technology Development Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Yang Andre
  • Company Name : Tianjin Lida Changji Technology Development Co., Ltd.
  • Tel : 86-022-87820393,1862207798
  • Fax : 86-022-87820493
  • Address : Tianjin,Tianjin,Room 3005,NO.6,Zi Yuan Road,Huayuan Industrial Park,Nankai District,Tianjin City.
  • Country/Region : China
  • Zip : 300384

High Adhesion Primer

High Adhesion Primer
Product Detailed
Related Categories:Paint & Coating
1.Use:pipe specia primer 2.Compatibility:special paint for Pipecoat corrosion prevention tape to add adhesiveness of tape

High adhesion primer for corrosion prevention tape:

1. With completion of surface pretreatment, steel surface may be uneven, primer may fill such unevenness to form a smooth film to increase contact area of pipe with adhesive layer for a strong bonding force. 

2. After pretreatment of pipe, primer may be able to get rid of dust on the pipe surface.

3. The moisture of pipe surface will volatilize with AP primer, thus reducing possibility of corrosion.

Time interval from pretreatment to paining of primer shall be within 4 hours, and timer interval from primer painting to winding of tape shall be within 8 hours and the primer surface shall be dry and without dust (winding of tape on very windy or humid days is not suggested).

For use of AP primer, primer shall be mixed and stirred to be even in a container. If primer is thick, add some thinner to dilute. Make use of clean brush, roll and other mechanical methods to paint primer. The primer painted on pipe shall not have missed spots, no bubbles, blots or dripping, and even film is to be formed. Each liter of primer shall cover pipe area 10-12 m2 with manual operation. With drying of primer, start winding of adhesive tape.

  

Item

Pipecoat AP Prime paint

Color

Black

Solid content

≥15%

Viscosity (for 4 cups)

10-30

Compatibility with tape

Special paint for Pipecoat corrosion prevention tape to add adhesiveness of tape

Surface drying time (min)

≤5

Storage mode

-5°C-+35°Csealed to be put in shadiness

Operation temp

-5°C-+50°C

Package

4L and 20L iron can is used for package

High Adhesion Primer



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.